Electromechanical Works of Çamlıca - Libadiye Tunnels (2017)

All electromechanical works belonging to this project were established by Özgen Group.

Istanbul Libadiye – Çamlıca Tunnels Electromechanical and Automation Works

• T1 Tunnel: 1,394 Meters
• T2 Tunnel: 1,465 Meters
• T3 Tunnel: 613 Meters
• Emergency Escape Tunnel: 248 Meters
• 1st Connection Tunnel: 250 Meters
• 2nd Connection Tunnel: 73 Meters
• 3rd Connection Tunnel: 16 Meters
• 4th Connection Tunnel: 9 Meters
Total Tunnel Length: 4,068 Meters

• Two Portals, Libadiye Portal and Çamlıca Portal
• Three Electricity Distribution Buildings and Transformer Center
• One Pump Room and Water Tank
• One Tunnel Control Center

Year of Construction: 2017-2018