Antalya Kemer Tunnels 1st Stage Electromechanical and Automation Works (2009)
In this project, all electromechanical systems were installed by Özgen Group.
Antalya Kemer Tunnels Phase I (Northern Tubes) Electromechanical and Automation Works
• Orhan Büyükalp Tunnel: 1,100 Meters
• Altan Ayağ Tunnel: 970 Meters
• Adnan Sezgin Tunnel: 330 Meters
Total Tunnel Length: 2,400 Meters
• Two Transformer Centers
• Two Electricity Distribution Centers
• One Tunnel Control Center
• One Water Tank and Pump Room
Year of Construction: 2009-2011