Antalya 3rd Stage Light Rail System Electrification Works (2018)
As Özgen Group, we are doing all the installation and commissioning works of the Electrification and Signalization systems of this project.
Antalya 3rd Stage Light Rail System Electrification Works
Line Length (Double Line): 19.5 km
• Depot Area Line Length: 4.1 km
• Cut and Cover and Bored Tunnel Length (Double Line): 1.9 km
• 11 Transformer Centers
• 27 Stations
• 1 Underground Station
• 4 Radio System Base Stations
• 1 Traffic Control Center (TCC)
• 18 Signaling Control Panels
• 23 Level Crossings
• 72 Switch Engines
Year of Construction: 2018-2021