Antalya 3rd Stage Light Rail System Signaling Works (2020)
All signaling works of this project were installed by Özgen Group.



Antalya 3rd Stage Light Rail System Signaling Works
Line Length (Double Line): 19.5 km
• Depot Area Line Length: 4.1 km
• Cut and Cover and Bored Tunnel Length (Double Line): 1.9 km
• 11 Transformer Centers
• 27 Stations
• 1 Underground Station
• 4 Radio System Base Stations
• 1 Traffic Control Center (TCC)
• 18 Signaling Control Panels
• 23 Level Crossings
• 72 Switch Engines
Year of Construction: 2018-2021