Antalya 2nd Stage Light Rail System Electrification Works (2015)
(TRAMWAY ELECTROMECHANICAL WORKS) All electromechanical works of this project were installed by Özgen Group.
Antalya 2nd Stage Light Rail System Electrification Works
Line Length (Double Track): 19.7 km
• 10 Transformer Centers
• 16 Stations
• 2 Base Stations
• 2 Level Crossings
• 11 Signal Control Panels
• 42 Switch Engines
Year of Construction: 2016-2017