top of page

Antalya 2nd Stage Light Rail System Signaling Works (2016)

All signaling works of this project were installed by Özgen Group.

Antalya 2nd Stage Light Rail System Signaling Works

Line Length (Double Line): 19.7 km
• 10 Transformer Centers
• 16 Stations
• 2 Base Stations
• 2 Level Crossings
• 11 Signal Control Panels
• 42 Switch Engines

Year of Construction: 2016-2017

bottom of page